INTERIM DESIGN MEETING NO. 2
Present:
Six And A Half Stitches - 6.5st
Blogland - BLG
Meeting held at 6.5st Headquartes on Jan 26th 2006 at 10.00am. NIL Absent.
CJ.01 - 6.5st reports extensive sampling process of J+S product has been undertaken and has now achieved sign off.
CJ.02 - Successful tenderer has been notified, and product procurement was undertaken last week.
CJ.03 - Site work has commenced, and work appears to be progressing well.
CJ.04 - 6.5st noted concern over sub contractors lack of shop drawings for details to neck opening, but was assured by SC that details would follow shortly. 17cm deadline - ALL NOTE.
CJ.05 - 6.5st tabled Progress Report No. 1, see attached. Apologies noted for absence of photographic progress, but all agreed hand drawn sketch indicative of actual progress.
6.5 st noted dissatisfaction of outside sub contractor to break the camera. Outside sub contractor noted camera would not have been broken if camera had not been left on corner of bench in direct line of travel of sub contractors overly large stomach as they attempted to gain 6.5st attention that they needed feeding immediately or they would die. 6.5st refutes claim outside contractor would die if cat food was not administered immediately, but accepts part blame for lack of working camera. All agreed camera would be dully fixed.
These reflect an true and accurate record of this meeting. Signed and dated............................
Further meetings to be held as required - TBA.




I love your design meetings, they are so funny. I hope you manage to get your camera fixed soon.
Posted by:yvette | January 26, 2006 at 10:26 PM
very amusing meeting and I love your charlie drawing!
Curse the subcontractor (and then give her a pat)
Posted by:di | January 30, 2006 at 08:46 PM